Booking & CapacityNovember 21, 20268 min read

42 Blank Sailings Expected: Check Your Year-End Booking

Your supplier has a cargo-ready date, the truck is being arranged and the receiver wants a delivery commitment. Then a cancellation notice raises a more immediate question: which sailing will actually take the cargo? The latest blank-sailing figures make this a useful time to review year-end bookings. Start with the vessel and voyage you hold, compare workable replacements, and confirm the new instructions before changing dispatch.

42
Blank sailings expected in Drewry's tracked trades
724
Planned sailings in the same assessment
6%
Reported cancellation rate, rounded
5 weeks
23 November to 27 December 2026

Source: Drewry Cancelled Sailings Tracker, 20 November 2026 edition, checked 21 November and linked below. Major East-West trades; expected sailings, not completed outcomes.

Find alternative sailing options for your route

Review available departures and connections. Confirm space, cargo acceptance, equipment and cut-offs with the carrier or forwarder before changing your booking.

Compare Sailing Schedules

What the latest blank-sailing figures cover

In its 20 November 2026 Cancelled Sailings Tracker, Drewry expects 42 blank sailings out of 724 planned sailings across major East-West trades from 23 November to 27 December, weeks 48 to 52. Its reported cancellation rate is 6%, rounded. This is an assessment of a future sailing window, not a tally of completed cancellations.

A trade-level percentage cannot tell you whether your booking is affected. It also counts sailings rather than container slots. Read it as context for checking the service you are using, then obtain the current position from the carrier or forwarder responsible for your cargo.

For the basic terminology, our blank-sailings guide explains the difference between a cancelled sailing and a delayed departure. In a booking review, identify exactly what has changed: the voyage, a port call, the vessel, or the timing. Each needs its own revised instructions.

First match the notice to your vessel, voyage and port

Before moving cargo or cancelling transport, check that the advisory applies to the booking you actually hold. A service name alone may leave too much room for confusion. Record the carrier, booking reference, vessel, voyage, load port and intended departure date together, then match those details to the notice.

  • Ask whether your specific booking is affected and whether the provider has already assigned a replacement sailing.
  • Confirm whether the change concerns your load port, a transhipment connection or the main sea leg.
  • Check the notice date and the latest version of the booking confirmation. Keep the superseded instruction for reference.
  • For a multi-container booking, ask which boxes are accepted on the replacement and whether any will move separately.

If the notice only changes a port call, ask how the revised itinerary serves your origin or destination. If a different vessel is named, confirm its voyage and dates rather than treating the substitution as a cancellation. Where a booking uses Gemini, our Suez service-change guide shows why matching service names to the correct voyage matters.

Get the replacement confirmed before dispatch

A possible departure in a schedule search is a candidate. Ask your provider to confirm cargo acceptance, space, equipment and the applicable receiving window for your booking before sending the truck.

Compare the whole replacement journey

Use Panvaya sailing schedules to review the departures and connections available for your origin and destination. In the signed-in Schedules dashboard, route insights help you inspect published departure dates and compare the returned carrier options, including direct options and available transit-time information.

Start with a departure that fits when your cargo can be ready. Then check the destination arrival, any transhipment and the inland delivery arrangement. An earlier first departure can still be a poor replacement if it introduces a connection that does not fit your receiving deadline.

Read the data coverage shown with the options. Schedule results reflect the information returned for that search; an empty date does not establish that a carrier has cancelled a voyage. Confirm any suspected blank sailing through the responsible provider. A published option also does not reserve space or establish cargo acceptance.

Shortlist the choices against the same requirements: load port, discharge port, equipment, cargo type, connections and final delivery scope. Ask your forwarder to identify which option can actually be booked. Keep the provider's written confirmation with the itinerary you choose.

Reconfirm these seven booking details

Once you have a proposed replacement, review the instructions that control cargo handover. Do not simply add a week to the old booking or assume every deadline moves with the vessel date:

  • Vessel and voyage: the specific replacement, service and load port accepted for your booking.
  • Equipment: the container type, quantity, release instructions and availability for the revised plan.
  • Terminal receiving window: when and where the terminal will accept the loaded container for that sailing.
  • Cargo cut-off: the applicable deadline, its time zone and any special instructions for your cargo.
  • Document deadlines: shipping instructions, verified gross mass and other required submissions, with confirmation of any amendments.
  • Connections and destination: the planned discharge call, onward legs and latest estimated arrival relevant to the receiver.
  • Commercial terms: the revised quotation, validity and any amendment, storage, transport or other charges the provider says apply.

If the box is already packed or at a terminal, tell the provider before accepting a replacement. Ask what should happen to the equipment while the next movement is arranged, and confirm who will issue any amended instructions. If the cargo has already missed its intended vessel, our rolled-cargo guide covers the follow-up questions for that situation.

Update the receiving plan with conditions attached

Separate the sailing you are investigating from one that has been confirmed. Tell the receiver which event has changed, the replacement under review, what remains outstanding and when the next update is due. Keep a provisional warehouse appointment marked as provisional until the final transport arrangement can support it.

For example, an illustrative update could say: Original voyage withdrawn; replacement sailing proposed; provider confirming space and cargo cut-off; delivery appointment remains provisional pending the revised itinerary. These are example circumstances, not the status of a live shipment. Replace each condition with the actual confirmation as it arrives.

Assign one person to reconcile the booking instruction, trucking arrangement and receiving update. If different colleagues own those steps, make the handover explicit so that an older terminal window or vessel date does not remain in somebody else's plan.

Track the replacement after the booking is amended

After the provider confirms the change, use container tracking to review available shipment-specific milestones against the revised plan. Check the location and whether an event is actual or estimated. An amended booking or a scheduled vessel departure does not itself confirm that your container has loaded or sailed.

For a team handling several affected shipments, Panvaya Fleet Analytics brings saved open shipments, position coverage, ETA history and carrier arrival reports into one review workflow. Use it to organise follow-ups across the references you manage. It is not an automatic detector of every blank sailing; provider notices and booking confirmations remain part of the review.

If the latest tracking event does not answer the question, ask the carrier or forwarder to reconcile it. Missing evidence is a reason to investigate, rather than proof that the replacement has failed. At destination, use the container release and pickup checklist to confirm collection separately from arrival.

The bottom line

Use the latest blank-sailing update to review the booking you hold. Match the advisory to its vessel and voyage, compare complete replacement journeys, and obtain new receiving and cut-off instructions before changing dispatch. Keep the receiver informed with confirmed milestones and clearly labelled estimates.

Find alternative sailing options for your route

Review available departures and connections. Confirm space, cargo acceptance, equipment and cut-offs with the carrier or forwarder before changing your booking.

Compare Sailing Schedules

Frequently asked questions

How many blank sailings are expected for late November and December 2026?

Drewry's 20 November tracker expects 42 out of 724 planned sailings across major East-West trades for 23 November to 27 December 2026, a reported rounded rate of 6%. The assessment can change as plans develop.

Does the cancellation percentage tell me whether my booking is affected?

No. Match your booking's carrier, vessel, voyage and port to the relevant advisory, then confirm the impact with the carrier or forwarder. A trade-level sailing count is not a prediction for a particular container.

Can I book a replacement directly from a published schedule?

Use schedule results to compare candidates. Ask your provider to confirm space, cargo acceptance, equipment, receiving instructions, cut-offs and commercial terms before treating an option as your confirmed replacement.

Does an empty date in a schedule search prove there is a blank sailing?

No. Results depend on the route, search window and available carrier information. Check coverage and obtain the applicable carrier notice or booking confirmation before describing a specific voyage as cancelled.

What should I monitor after my booking is changed?

Review the amended itinerary and available container milestones, including their locations and actual or estimated labels. Confirm loading, departure, onward connections and destination collection arrangements with the responsible parties as the shipment progresses.